hmp eastwood park
& HMP leyhill
Site: Predominantly Prisons- HMP Bristol, Eastwood park & Leyhill
Contractor: Total Construction
Job Description– We have been working for Total Construction for 4 years and have assisted them with all their flooring requirements working within the prisons.
Leyhill dining Hall– 700sqm. Work carried out, repair cracks in existing subfloor, 5mm coat of latex, application of a DPM, top coat of latex and installation ofAmtico Signiture LVT planks and Amtico Barrier matting carpet tiles
Eastwood Park Res 6 Corridors-160sqm. Work carried out, Uplift of existing floor coverings, latex, IVC Tempo Saftey flooring self coved to 150mm
HMP Bristol Corridors-240sq Work carried out, Uplift of existing floor coverings, latex, Tarasafe standard saftey flooring, completed out of hours
We have also completed many other smaller projects, Leyhill vistors centre in carpet tiles, Repairs to existing flooring in the kitchens and wings, Leyhill C1 Block consisting of 27 cells in carpet tiles and corridors in Altro walkway. To mention a few, all completed within this unique working environment.